Home     Sitemap     Contact Us

Wastewater System Overview
Raw wastewater in Bastrop travels through a network of over 53 miles of wastewater collection lines and numerous lift stations to two wastewater treatment plants.  These treatment plants serve a population of approximately 8,700 people.

 

GRAVITY LINES

FORCE MAINS

Main Size

Length

Main Size

Length

3”

350’

2”

2,462’

4”

3,772’

3”

4,722’

6”

97,340’

4”

3,247’

8”

85,620’

6”

3,839’

10”

23,859’

8”

18,425’

12”

22,571’

10”

8,393’

15”

4,285’

18”

4,783’

Total Gravity Lines:  242,580 feet (46 miles!)Total Force Mains:  41,088 feet (7.78 miles!)

The City also maintains 628 manholes and countless sewer clean-outs.

Copyright © City of Bastrop  2016. All rights reserved.

powered by  ezTaskTitanium  TM